Water Leak: 10-24-16

2 Leaks were found and repaired at the meter box of 17505 Satsuma Circle. The supply line to the meter was split and repaired. We noticed the supply line to the house of 17515 was broken as well. As a courtesy, we repaired this for the homeowner. A professional plumber was hired to make these […]

Water Leak: 9-10-16

A supply line leak was discovered at 17539 Mandarin Circle, about 5 feet to the right of the power pole. The pipe was fixed within 5 hours of discover and the water was off for only a couple hours. The blue water supply line had split, so it was cut back and re-capped off (It […]

Chlorine Pump Replacement on August 2nd 2016

We were notified by Plantec during their inspection that our secondary Chlorine Pump had failed. The finance committee approved the purchase of a new pump, it was installed by David Smythe and Chris Carter on August 2nd, 2016. At this time, the injectors were also cleaned out, as they have continually caused lines to blow out […]

Project: Mailbox Roof & Painting

Update: 5-3-16 It took a little time, but thanks to Mrs. Avila we got it all done! Update: 2-1-16 The roof has been replaced with metal roofing donated by the Smythes. Thank you to them and everyone who assisted getting the roofing replaced. We also cleaned up the surrounding area a bit as well. Still […]

Water Leak: 4-21-2016

Update 4-23-16: This leak has been fixed. The split portion of the flexible pipe was removed, and a brass coupling was installed. The meter box was also repaired and cleaned out. There has been a water main leak at the line that feeds Lot 22 at 17538 Satsuma Circle. A patch has been made, and […]

Water Leak: 4-4-16

On April 4th, 2016, at around 4:45. Claudia Smythe reported a water leak at the tank. It was determined that the 4″ main water line at the elbow was the problem, about 4ft under ground. We were unable to determine if this leak was due to a previous generations installation error, or deterioration. Several neighbors […]